Pass out the singal
- cable from the passing-tube.Tie up the singal cable on the iron wire in the passing-tube when passing.Then pull the iron wire to achieve the gogal of passing.Next join the singal cable to the junction box.Attention to the marking on the load cell and junction box should be consistent,then fix up the junction box onto the side-cover paltes.
- Fix up one end of the ground-cable onto the connecting-plate using M16 bolts,and fix up the other end of the ground-cable onto the ball base using M12 bolts to let the load cell short-connection.it will protects the load cell from damage by lighting when they are working.
Pass out the singal
相關(guān)產(chǎn)品
免責(zé)聲明
- 凡本網(wǎng)注明“來源:化工儀器網(wǎng)”的所有作品,,均為浙江興旺寶明通網(wǎng)絡(luò)有限公司-化工儀器網(wǎng)合法擁有版權(quán)或有權(quán)使用的作品,未經(jīng)本網(wǎng)授權(quán)不得轉(zhuǎn)載,、摘編或利用其它方式使用上述作品,。已經(jīng)本網(wǎng)授權(quán)使用作品的,應(yīng)在授權(quán)范圍內(nèi)使用,,并注明“來源:化工儀器網(wǎng)”,。違反上述聲明者,本網(wǎng)將追究其相關(guān)法律責(zé)任,。
- 本網(wǎng)轉(zhuǎn)載并注明自其他來源(非化工儀器網(wǎng))的作品,,目的在于傳遞更多信息,并不代表本網(wǎng)贊同其觀點(diǎn)和對其真實性負(fù)責(zé),,不承擔(dān)此類作品侵權(quán)行為的直接責(zé)任及連帶責(zé)任,。其他媒體、網(wǎng)站或個人從本網(wǎng)轉(zhuǎn)載時,,必須保留本網(wǎng)注明的作品第一來源,,并自負(fù)版權(quán)等法律責(zé)任。
- 如涉及作品內(nèi)容,、版權(quán)等問題,,請在作品發(fā)表之日起一周內(nèi)與本網(wǎng)聯(lián)系,否則視為放棄相關(guān)權(quán)利,。