產(chǎn)品搜索
請輸入產(chǎn)品關(guān)鍵字:
聯(lián)系方式
地址:上海浦東新區(qū)拱優(yōu)路79弄10號
郵編:201202
聯(lián)系人:耿永光
電話:86-021-58378307-601
傳真:86-021-58378307-606
手機:15216829778
留言:發(fā)送留言
個性化:www.shzqhq.com
網(wǎng)址:www.shzqhq.com
商鋪:http://sorrent.com.cn/st296521/
郵編:201202
聯(lián)系人:耿永光
電話:86-021-58378307-601
傳真:86-021-58378307-606
手機:15216829778
留言:發(fā)送留言
個性化:www.shzqhq.com
網(wǎng)址:www.shzqhq.com
商鋪:http://sorrent.com.cn/st296521/
技術(shù)文章
Simple installation steps
點擊次數(shù):1283 發(fā)布時間:2017-12-25
Simple installation steps
- Check all goods against list. Pay attention to the steel-seal letter 1↓ 1↑2↓2↑3↓3↑4↓4↑ on the surface of the scale-bodies,load cells,iron cases(See the following figure).Be ready to install.
1↓ 2↓ | 3↓ 4↓ |
1↑ 2↑ | 3↑ 4↑ |
Lift the scale-bodies of corresponding marking with the 28MM shackle and assemble with a crane(usually 15T),overturn and lie them flat(pad wood under the scale bodies to prevent the paint scalling off),the marking of 1↓2↓ with the marking of 1↑2↑ of the scale body,the marking of 3↓ 4↓with the marking of 3↑4↑of the scale-body,each should be tighten the scale-bodies with 105 sets of M20×60 socket head cap bolts with M30 adjustable spanner.M20 socket head cap spanner andφSimple installation steps